Mid-Coast Transit Corridor, San Diego, CA

https://www.cell-crete.com/build/wp-content/uploads/2018/12/Cell-Crete-Mid-Coast-Corridor-Project-1.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/12/Cell-Crete-Mid-Coast-Corridor-Project-3.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/12/Cell-Crete-Mid-Coast-Corridor-Project-2.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/12/Cell-Crete-Mid-Coast-Corridor-Project-4.jpg

Project: Mid-Coast Transit Corridor, San Diego, CA

Title:

Description:

Mid-Coast Transit Corridor, San Diego, CA

Cell-Crete-Mid-Coast-Corridor-Project-4
Cell-Crete-Mid-Coast-Corridor-Project-1
Cell-Crete-Mid-Coast-Corridor-Project-3
Cell-Crete-Mid-Coast-Corridor-Project-2

About The Project

PROJECT LOCATION

San Diego, California

COMPLETION DATE

Ongoing

A double track for the Burlington Northern and Santa Fe (BNSF) Railway is being constructed at the San Diego River Bridge. The Mid-Coast Transit Corridor project is being built in two stages to keep the track operating throughout construction.

The Solution

Cellular concrete is being used to raise the track’s elevation and also being added in between full-height Mechanically Stabilized Earth (MSE) panels due to the access on either side of the wall.