Draper, UT
Rasmussen Farms is farmland that is being turned into a new development with over 50 units. The site plan shows a 10” RCP sewer line that runs East to West into another condo/apartment complex then turned south from a manhole to the other site entrance. This run of pipe was just under 1,000 LF and they needed to abandon the line with flowable fill.
LCC was selected to abandon the sewer line because of its flowability and our ability to batch it on site. We were able to stage our equipment in one location and pump uphill to the vented end of the sewer line. The general contractor prepared two manholes to allow the LCC to flow through them to the vent. This plan allowed us to pump LCC without having to add a second injection point in the condo/apartment property.