Project: Pipeline 4 Relining, Lake Murray

Title:

Description:

Pipeline 4 Relining, Lake Murray

Cell-Crete-Pipeline-4-project-1
Cell-Crete-Pipeline-4-project-10
Cell-Crete-Pipeline-4-project-11

About The Project

PROJECT LOCATION

San Diego, California

COMPLETION DATE

2017

Existing waterline prestressed concrete cylinder pipes (PCCP) required reinforcement.

The Solution

The waterline is set to be reinforced with new steel lining, and the steel liner is then placed in segments and welded together inside of the pipe, leaving a small annular space behind. Intimate contact between the host pipe and carrier pipe is required. Cellular concrete is being used to fill the annular space that varies from 1.5″ to 3″, and grouting takes place from inside the pipeline through grout ports prefabricated in the steel liner.