NCMT Berth 24-10, Port of San Diego
- Category
- Geofoam
About The Project
PROJECT LOCATION
San Diego, California
COMPLETION DATE
2017
The existing wharf structure for the National City Marine Terminal (NCMT) required load-reduction fill material due to the increased load applied by pile cap connections on the wharf deck in order to comply with the seismic reinforcement retrofit.
The Solution
Geofoam was chosen for this project since it’s the lightest fill material available and also provides excellent bearing capacity.