Cell Crete’s scope of work on this project included the abandonment of portions of existing pipelines 3 and 4. Class II cellular concrete was selected as the backfill material to abandoned the existing waterlines. A 69” and a 72” pipe were abandoned each were roughly 1000’ in length, in the end we ended up placing over 2500CY in just under 4 days.