Riverside, CA
The Lincoln Avenue Techite Pipe Replacement Project will improve the operation and reliability of Riverside Public Utilities’ water system by replacing aged and undersized water pipelines currently in use along Lincoln Avenue.
The existing 42” pipe was scheduled to be abandoned in place with a flowable fill. 100 PSI cellular concrete material was used to abandon the 4230’ line, it took 3 days to fill the line moving down to each injection in the middle of the road with little disruption to live traffic.