Bellevue, Washington
The Central Puget Sound Regional Transit Authority (Sound Transit)
Cell-Crete has been contracted for the Sound Transit E-320 project in Bellevue, Washington. This project is part of an East Link Extension that will eventually connect a link light rail line from downtown Seattle to downtown Bellevue. Cellular concrete was specified in an area with soft-soil conditions and to reduce the lateral pressure on the 112th Ave. overcrossing. The project is being done in 3’–4’ lifts at approximately 600–800 CY (cubic units) filled per day with the total yardage of around 8,500 CY.