Doyle Drive Tunnel Roof Fill, San Francisco, CA

https://www.cell-crete.com/build/wp-content/uploads/2018/08/Doyle-Drive-3.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/08/Doyle-Drive-2.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/08/Doyle-Drive-4.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/08/Doyle-Drive-5.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/08/Doyle-Drive-6.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/08/Doyle-Drive-7.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/08/Doyle-Drive-8.jpg
https://www.cell-crete.com/build/wp-content/uploads/2018/08/Doyle-Drive-1.jpg

Project: Doyle Drive Tunnel Roof Fill, San Francisco, CA

Title:

Description:

Doyle Drive Tunnel Roof Fill, San Francisco, CA

Doyle-Drive-8
Doyle-Drive-7
Doyle-Drive-6
Doyle-Drive-5
Doyle-Drive-4
Doyle-Drive-3
Doyle-Drive-2
Doyle-Drive-1

About The Project

PROJECT LOCATION

San Francisco, California

CLIENT

California Department of Transportation (Caltrans)

COMPLETION DATE

2017

Caltrans was concerned about the fill load on the tunnel roof of Doyle Drive on Highway 101. Lightweight cellular concrete (LCC) was selected because it was lighter than natural fill and no compaction was needed.

The Solution

Cell-Crete Corporation was subcontracted to perform the tunnel roof fill job with 27 PCF (pounds per cubic foot) (40+PSI) LCC material.