Ocean Blvd Project

https://www.cell-crete.com/build/wp-content/uploads/2021/12/271765651_114130037752873_6394065183093167230_n.jpg

Project: Ocean Blvd Project

Title:

Description:

Ocean Blvd Project

271765651_114130037752873_6394065183093167230_n.jpg

Ocean Blvd Project

PROJECT LOCATION

Long Beach, CA

The Project

We recently completed the Ocean Blvd Project with The Port of Long Beach after they started construction on a new
bicycle/pedestrian bridge east of the Gerald Desmond Bridge off Pico Avenue. The goal was to convert the existing vehicle lanes into a two-way bicycle lane and assist with traffic flow.

The Solution

Cell-Crete poured lightweight cellular concrete (LCC) behind the MSE Walls of the bridge. LCC was specified as backfill for the project as it reduces the fill load under the bridge, resolves settlement concerns, and offers environmental protection.

Project Assets