Bishop Amat High School

https://www.cell-crete.com/build/wp-content/uploads/2021/06/Bishop-Amat-High-School-Cell-Crete-Project.png

Project: Bishop Amat High School

Title:

Description:

Bishop Amat High School

Bishop-Amat-High-School-Cell-Crete-Project.png

About The Bishop Amat High School Project

PROJECT LOCATION

La Puente, California

COMPLETION DATE

2021

We installed Lightweight Insulating Concrete (LWIC) over a 3 inch in 1 foot sloped vented metal deck. LWIC Roof decks can provide FM and UL ratings. For this project, we provided a 1 1/2 hour fire rated system as required in the specification.

The Solution

Bishop Amat High School is building a permanent home for their visual and performing arts programs. This project will also benefit the surrounding community, who will have access to the new facility.