San Diego, California
2017
The existing wharf structure for the National City Marine Terminal (NCMT) required load-reduction fill material due to the increased load applied by pile cap connections on the wharf deck in order to comply with the seismic reinforcement retrofit.
Geofoam was chosen for this project since it’s the lightest fill material available and also provides excellent bearing capacity.